VW Sharan repair. Diesel engines: 1,9 l of TDI.+ 1. Introduction + 2. VR6 engine - 3. Two-liter engine (ADY) 3.1. Removal and installation + 3.2. Dismantling and assembly - 3.3. Head of the block of cylinders and valves 3.3.1. Removal of a head of the block of cylinders 3.3.2. Dismantling of a head of the block of cylinders 3.3.3. Repair of a head of the block of cylinders 3.3.4. Assembly of a head of the block of cylinders 3.3.5. Installation of a head of the block of cylinders 3.3.6. Hydraulic pusher 3.3.7. Replacement of an epiploon of a camshaft + 3.4. Pistons and rods 3.5. Block of cylinders + 3.6. Cranked shaft and radical bearings + 3.7. Drive of the mechanism of a gazoraspredeleniye 3.8. Adjustment of a tension of a driving belt of units of the engine 3.9. Intermediate shaft 3.10. Compression check in engine cylinders 3.11. System of production of the fulfilled gases 3.12. Cleaning system with absorbent carbon application 3.13. System of a retsirkulyatsiya of the fulfilled gases + 4. System of greasing of the engine + 5. Cooling system + 6. System of injection of fuel of the VR6 engine + 7. Simos system of injection of fuel of the 2,0-liter engine + 8. Ignition system + 9. Coupling + 10. Mechanical 5-step transmission + 11. Shaft of a drive of wheels + 12. Hydraulic booster of a steering + 13. Forward suspension bracket + 14. Back suspension bracket + 15. Brake system + 16. Electric equipment + 17. Diesel engine + 18. System of greasing of the diesel engine + 19. System of cooling of the diesel engine + 20. Power supply system of the diesel engine and turbokompressor + maintenance Card + Specifications and characteristics + Elektroskhema |
Repair Sharan/Sharan Volkswagen>> Two-liter engine (ADY)>> Head of the block of cylinders and valves>> Installation of a head of the block of cylinders Installation of a head of the block of cylinders carry out in the following order:
- clear surfaces of a head of the block of cylinders and the block of cylinders and put laying of a head of the block of cylinders so that «Oben» or "Top" inscription from above was visible. Always establish the new laying corresponding to number of this spare part;
- for the correct arrangement of laying
two directing fingers should be inserted into places of fastening of bolts No. 8 and 10 (see fig. 125) on the block of cylinders 3070
(fig. 124)
. At their absence to insert into the corresponding openings in a head of the block of cylinders directing pins;
- establish a head of the block of cylinders and обстучите its plastic or rubber hammer. That valves did not strike on a bottom of pistons, establish the piston of the first cylinder in situation VMT and turn a cranked shaft against the rotation direction on 90 °. Thanks to it all pistons will be located below situation VMT. Establish a head of the block of cylinders only in this provision of a cranked shaft;
- insert eight bolts of fastening of a head of the block of cylinders and twirl them by hand;
- twist directing fingers 3070 and screw instead of them the remained bolts of fastening of a head of the block of cylinders;
- according to the sequence shown on
fig. 125
, gradually tighten all bolts of fastening of a head of the block of cylinders at first the moment of 40 N · m and it is final — 60 N · m; in the specified sequence insert a key into each bolt, having remembered situation a vorotka, and tighten each bolt for one approach precisely on a half of a turn or twice on a turn quarter;
- insert a key into each bolt of fastening, having remembered situation a vorotka and according to sequence (see
fig. 125
), tighten each bolt for one approach precisely on a turn quarter;
- repeat this pass in the same way once again;
- establish a gear driving belt 1 (see
fig. 103
) and adjust a drive of the mechanism of a gazoraspredeleniye;
- paste laying 9 (see
fig. 105
) covers of a head of the block of cylinders on a head of the block of cylinders;
- put on a cover of a head of the block of cylinders. At the left and to the right of a cover of a head of the block of cylinders put on adjusting pins strengthening and evenly around tighten nuts with the moment of 10 N · m;
- the remained operations carry out to sequences, return to removal, being guided thus by drawings on assembly;
- after completion of all operations fill in liquid in cooling system.
|
|